Reconstruction of Gas Pipeline DN500 Goleniów-Police in the North Poland (Szczecin Region)


  • Construction of gas pipeline
  • Gas Pipeline length 1.9 km, DN500, MOP 84 barg
  • Horizontal directional drilling (HDD) with length of 1.800 m
  • Hot tapping works