Construction of gas pipeline and GMS for LNG terminal in Lithuania
- Engineering and Construction of Gas Pipeline and Gas Metering Station
- Gas Pipeline length 18km, DN700, MOP 60 barg
- Gas metering / regulation station with flowrate of 460.000 nm3/h
- 2 x HDDs (2.300 m & 600 m) under the Curonian Lagoon