Construction of LNG reloading station in Klaipeda


  • Engineering and Construction of LNG Reloading Station with volume of 5000 m3 (design for 10.000 m3)
  • Jetty module for ships unloading/loading and truck filling bays
  • NG evaporation rate up to 7.000 nm3/h

2019